E1C01:

What is the maximum bandwidth for a data emission on 60 meters?

  1. 60 Hz
  2. 170 Hz
  3. 1.5 kHz
  4. 2.8 kHz

E1C02:

Which of the following types of communications may be transmitted to amateur stations in foreign countries?

  1. Business-related messages for non-profit organizations
  2. Messages intended for users of the maritime satellite service
  3. Communications incidental to the purpose of the amateur service and remarks of a personal nature
  4. All these choices are correct

E1C03:

How do the control operator responsibilities of a station under automatic control differ from one under local control?

  1. Under local control there is no control operator
  2. Under automatic control the control operator is not required to be present at the control point
  3. Under automatic control there is no control operator
  4. Under local control a control operator is not required to be present at a control point

E1C04:

What is meant by IARP?

  1. An international amateur radio permit that allows U.S. amateurs to operate in certain countries of the Americas
  2. The internal amateur radio practices policy of the FCC
  3. An indication of increased antenna reflected power
  4. A forecast of intermittent aurora radio propagation

E1C05:

When may an automatically controlled station originate third party communications?

  1. Never
  2. Only when transmitting RTTY or data emissions
  3. When agreed upon by the sending or receiving station
  4. When approved by the National Telecommunication and Information Administration

E1C06:

Which of the following is required in order to operate in accordance with CEPT rules in foreign countries where permitted?

  1. You must identify in the official language of the country in which you are operating
  2. The U.S. embassy must approve of your operation
  3. You must bring a copy of FCC Public Notice DA 16-1048
  4. You must append "/CEPT" to your call sign

E1C07:

At what level below a signal's mean power level is its bandwidth determined according to FCC rules?

  1. 3 dB
  2. 6 dB
  3. 23 dB
  4. 26 dB

E1C08:

What is the maximum permissible duration of a remotely controlled station's transmissions if its control link malfunctions?

  1. 30 seconds
  2. 3 minutes
  3. 5 minutes
  4. 10 minutes

E1C09:

What is the highest modulation index permitted at the highest modulation frequency for angle modulation below 29.0 MHz?

  1. 0.5
  2. 1
  3. 2
  4. 3

E1C10:

What is the permitted mean power of any spurious emission relative to the mean power of the fundamental emission from a station transmitter or external RF amplifier installed after January 1, 2003 and transmitting on a frequency below 30 MHz?

  1. At least 43 dB below
  2. At least 53 dB below
  3. At least 63 dB below
  4. At least 73 dB below

E1C11:

Which of the following operating arrangements allows an FCC-licensed U.S. citizen to operate in many European countries, and alien amateurs from many European countries to operate in the U.S.?

  1. CEPT agreement
  2. IARP agreement
  3. ITU reciprocal license
  4. All these choices are correct

E1C12:

On what portion of the 630 meter band are phone emissions permitted?

  1. None
  2. Only the top 3 kHz
  3. Only the bottom 3 kHz
  4. The entire band

E1C13:

What notifications must be given before transmitting on the 630 meter or 2200 meter bands?

  1. A special endorsement must be requested from the FCC
  2. An environmental impact statement must be filed with the Department of the Interior
  3. Operators must inform the Utilities Telecom Council of their call sign and coordinates of the station
  4. Operators must inform the FAA of their intent to operate, giving their call sign and distance to the nearest runway

E1C14:

How long must an operator wait after filing a notification with the Utilities Telecom Commission before operating on the 2200 meter or 630 meter band?

  1. Operators must not operate until approval is received
  2. Operators may operate after 30 days, providing they have not been told that their station is within 1 km of PLC systems using those frequencies
  3. Operators may not operate until a test signal has been transmitted in coordination with the local power company
  4. Operations may commence immediately, and may continue unless interference is reported by the UTC